A Current Sets Product

Own your knowledge. No more surprises.

mine.build turns Current Sets' plan intelligence into Screens: reusable, automated checks your team builds once and runs on every set, past and future. Your standards. Your data.

The Problem

Every team ends up building its standards on someone else's foundation: one that doesn't scale, or isn't theirs.

01

One-Off Tools

Internal teams build one-off scripts and spreadsheets to check drawings: tools that don't scale past the person who built them, and don't survive them leaving.

02

Outside Vendors

A new wave of companies is forming to own your checks for you. You get the output, but you rent the intelligence and never own the data.

03

Misaligned Incentives

When someone else owns the rulebook for your standards, their incentives and yours stop lining up, especially as your standards evolve.

Your standards. Your knowledge. Burned once, screened forever.

We've already done the hard part: extracting structured intelligence out of construction drawings. mine.build gives your team the layer on top.

Built on the same plan intelligence behind

750+
Projects Reviewed
180K+
Issues Found
$40B+
Construction Value

How it works

Mine your plans. Burned once, screened forever.

01 Build a Screen

Choose exactly what it checks.

Pick from the same capabilities our reviewers use every day: which sheets to look at, what text to search for, where to look visually, where to cross-reference between pages or disciplines, and when to leave a comment. Turn on only what a given Screen needs.

Screen builder
✓
📋 Drawing Names & Titles
Corridor & stair plans, A2.01–A2.09
✓
🔍 Search Text / Keywords
"CLR MIN", "EGRESS WIDTH"
✓
👁 Visual Inspection
Confirm the printed callout matches the drawn width at every pinch point
📂 Cross-Discipline Overlay
Not needed for this Screen
✓
💬 Create Comment
Flag any corridor or stair run under 44″ clear
✓
📋 Drawing Names & Titles
Unit plans + overall unit matrix, A1.10–A1.42
✓
🔍 Search Text / Keywords
Unit type, unit count, SF
✓
👁 Visual Inspection
Confirm each unit plan's labeled type matches its tag on the matrix
📂 Cross-Discipline Overlay
Not needed for this Screen
✓
💬 Create Comment
Flag any unit where the plan and matrix disagree
✓
📋 Drawing Names & Titles
MEP riser diagrams + architectural floor plans, M1.01–M1.09
🔍 Search Text / Keywords
Not needed for this Screen
✓
👁 Visual Inspection
Confirm riser position holds constant floor to floor
✓
📂 Cross-Discipline Overlay
Overlay MEP riser against the architectural/structural plan, floors 2–9
✓
💬 Create Comment
Flag the exact floor where the riser shifts out of alignment
02 Save & schedule

Save it once. It runs itself from here.

Tell it which kind of project and which phase it belongs to. Every Market Rate (Prototype Design) project that reaches Permit Set runs this Screen automatically. No one has to remember to launch it.

Save Screen
Egress Width & Clearance
Market Rate (Prototype Design) ▾
Permit Set ▾
Run automatically, new and existing projects
Save Screen

See risk across your whole pipeline.

Every project issues its sets on its own schedule. See how many Screens ran at each milestone, and hover a milestone to see what got flagged.

Project
50% DD Set 50% CD Set Permit Set IFC Set
Riverside Multifamily
15 Screens
50% DD Set · 15 Screens No flags at this phase.
40 Screens
50% CD Set · 40 Screens, 3 flagged
  • Egress width below 44″ clear, Corridor A2.07
  • Unit mix mismatch, Building B Level 3
  • MEP riser shift, floors 5–6
Upcoming
Upcoming
Cedar Point Phase 2
12 Screens
50% DD Set · 12 Screens No flags at this phase.
38 Screens
50% CD Set · 38 Screens, 7 flagged
  • Egress width below minimum, 2 corridors
  • ADA clearance fail, 4 unit entries
  • MEP riser misalignment, floors 3–9
22 Screens
Permit Set · 22 Screens, 2 flagged
  • Beam-to-column callout mismatch, Grid D4
  • Duct-to-structure conflict, Level 6
Upcoming
Oakview Commons
9 Screens
50% DD Set · 9 Screens No flags at this phase.
Upcoming
Upcoming
Upcoming
Birchwood Terrace
11 Screens
50% DD Set · 11 Screens, 1 flagged
  • Unit matrix count mismatch, Building A
Upcoming
Upcoming
Upcoming

Don't rent your standards.

Ready to build your first Screen, or just want to learn how this works?